Call 811 Before You Dig Toolbox Talk

Hitting a buried power cable or gas main can kill you instantly or start a fire. Even a fiber optic or water line strike can cost thousands and shut down a street. Every dig starts with finding out what is in the ground.

Takes about 7 minutes, plus a 5-question quiz.

Key points to read out

  1. Call 811 or submit an online request a few working days before you dig, as your state requires. It is free.
  2. Plans are a guide only. Services move, depths change, and private lines are often not on any plan.
  3. Wait for the locate marks. Red is electric, yellow is gas or oil, orange is communications, blue is water, green is sewer, purple is reclaimed water, pink is survey marks and white is the proposed dig.
  4. Share the plans and the marks with everyone on the dig, including the machine operator and any subcontractors, before work starts.
  5. Keep the marks visible. If rain, traffic or digging wipes them out, stop and get them re-marked.
  6. Hand dig or vacuum excavate within the tolerance zone, usually 18 to 24 inches either side of the mark depending on your state.
  7. Look for clues: meter boxes, pits, lids, street lights and patched pavement all point to buried services.
  8. Keep the plans and locate records on site and in date.
  9. If you strike a service: stop, keep everyone back, and call the asset owner straight away.
  10. For a gas strike: move everyone away, no smoking or ignition sources, and call emergency services.
  11. If a machine hits a power cable, the operator stays in the cab and everyone else keeps well back until the network says it is safe.
  12. Never fill in or cover a damaged service, even a small nick in the coating. Report it so it can be repaired properly.

Questions to ask the crew

  1. Do we have current service plans for this dig?
  2. Which services are close to where we are digging today?
  3. How close can the machine get before we switch to hand digging?
  4. What would you do if we hit a gas line?
  5. Who has the locate records, and does everyone on the dig know where they are?

How to run this talk

  • Run the talk at the dig site with the service plans and locate marks in front of the crew.
  • Walk the marks together and point out clues such as pits, meters, lids and patched pavement.
  • Make sure the machine operator and any subcontractors have seen the plans.
  • Agree exactly where the machine stops and hand or vacuum digging starts.
  • Practise the strike response: who calls the asset owner and emergency services, and where everyone goes.
  • Record attendance and the plan reference numbers on the sign-in sheet.

Call 811 Before You Dig quiz

Ask these after the talk. Answers are underneath each question.

  1. What is the first step before any digging, even with a shovel?

    1. Call 811 or submit an online request a few working days ahead
    2. Start digging slowly and watch for cables
    3. Ask the person who last worked here

    Answer: A. You cannot see what is buried, so the dig starts with finding out what services are there and who owns them.

  2. You have the plans. How accurate are they?

    1. Exact to the centimetre
    2. A guide only, because services move and private lines are often missing
    3. Accurate for depth but not position

    Answer: B. Plans show approximate positions, so services must be located on site and exposed before machines dig near them.

  3. The excavator is getting close to a located service. What should happen?

    1. Keep digging with the bucket but go slower
    2. Switch to hand digging or vacuum excavation inside the tolerance zone, usually 18 to 24 inches either side of the mark
    3. Dig faster so the service is uncovered quickly

    Answer: B. Machines can hit and rupture services before the operator feels anything, so you expose them by hand or vacuum.

  4. You smell gas after striking a pipe. What do you do?

    1. Try to plug the pipe with tape
    2. Move everyone away, remove ignition sources, and call 911 and the gas company
    3. Fill the hole back in to stop the smell

    Answer: B. Never try to fix a gas leak yourself: gas can overcome you in the trench or ignite, so get clear and let the network make it safe.

  5. An excavator hits a buried power cable. What should the operator do?

    1. Jump out and run
    2. Stay in the cab and keep everyone back until the network says it is safe
    3. Climb down and check the damage

    Answer: B. The ground and machine can be live, so staying in the cab avoids stepping into a path for the current.

Questions about call 811 before you dig

What is 811 and when do I need to call?

811 is the free national call before you dig number, and most states also take online requests. Contact it a few working days before digging, as your state law sets, so utility owners can mark their lines; then wait for the marks and respect the tolerance zone.

Are utility plans accurate enough to dig by?

No. Plans are a guide only: services move during other works, depths change when ground levels change, and private lines are often not shown. Always locate services on site and expose them by hand or vacuum before machines dig nearby.

How close can you dig to an underground service with a machine?

Most states set a tolerance zone of 18 to 24 inches either side of the outside edge of the marked facility, and inside it you hand dig or vacuum excavate. Check your state's one call law for the exact distance.

What should you do if you hit an underground service?

Stop work, keep everyone back and contact the utility owner and 811. For gas, move everyone away, remove ignition sources and call 911; for power, the operator stays in the machine. Never cover up a damaged line, even a small nick in the coating.