FLHA for tree removal

Provincial OHS law requires hazards to be assessed and controlled before work starts. A field level hazard assessment (FLHA) for tree removal is done on site at the start of the shift and again whenever conditions change.

It lists the tasks, hazards and controls, and every worker signs on before starting and signs off at the end of the shift. The main hazards are falling from height, road traffic, aerial work platform tip-over or crush and falling tools and materials.

FLHA example: tree removal

This is a complete FLHA for tree removal, with 10 job steps. Open it in the builder to add your site, crew and signatures, change anything, and download a PDF. Or download the free Word template below and fill it in by hand.

Field Level Hazard Assessment (FLHA)
Tree removal and pruning with a chainsaw · Landscaping · Example
Document FLHA-001 · Rev 1

Job steps, hazards and controls

#Job stepHazardsRisk beforeControlsRisk after
1Assess the tree for lean, decay and dead wood, check for power lines and buildings, and plan escape routes; keep 2 tree lengths clear when felling
  • Contact with overhead power lines
  • Falling tools and materials
High
  • Ask the utility to de-energize, move or insulate the lines before work starts. Elimination
  • Use non-conductive (fibreglass) ladders near any power lines. Substitution
  • Mark the safe distance with flags, tape or goal posts and keep all equipment and people outside it. Engineering (guarding)
  • Keep to the provincial limits of approach and contact the utility before working near lines. Administrative
  • Use a dedicated spotter whenever equipment moves or raises anything near lines. Administrative
  • Treat all lines as live. If equipment touches a line, stay in the cab and keep everyone well away. Administrative
  • Barricade and sign the drop zone under overhead work so nobody walks beneath. Engineering (guarding)
  • Fit toe boards, kick plates and mesh screens on scaffolds and edges. Engineering
  • Falling tools and materials: see step 7 for the full controls Administrative
Medium
2Set up the drop zone with barriers and traffic or pedestrian control
  • Public entering the work area
  • Road traffic
Critical
  • Fence off the site with secure temporary fencing and lock the gates when you leave. Engineering (guarding)
  • Give pedestrians a safe, marked path around the work, with ramps for strollers and wheelchairs. Engineering (guarding)
  • Use hoarding, covered walkways or catch fans where work is above public areas. Engineering
  • Put signs at each entry: site name, contact number and "No unauthorised entry". Administrative
  • Make the site safe at the end of each day: cover holes, lower buckets and booms, remove ladders and lock tools away. Administrative
  • Use a spotter when moving equipment or materials across public paths. Administrative
  • Do the work at low-traffic times, or close the road or lane with approval. Elimination
  • Put solid barriers between the work and traffic where speeds are high, not just cones. Engineering (guarding)
  • Use a truck-mounted attenuator or buffer vehicle on high speed roads. Engineering
  • Set up signs and cones to your provincial traffic control manual, with trained traffic control persons. Administrative
  • Get a road occupancy permit from the municipality or road authority before you start. Administrative
  • Park work vehicles to shield the work zone, with beacons on. Administrative
  • Wear high-visibility clothing to CSA Z96. PPE
Medium
3Check the chainsaw, chain brake and PPE before starting
  • Chainsaw injuries
  • Loud noise
High
  • Use a different tool where you can, such as a pole saw or hand saw for small branches. Substitution
  • Use a saw with a working chain brake, chain catcher and low-kickback chain, kept sharp and tensioned. Engineering
  • Only trained operators use chainsaws. Administrative
  • Never cut above shoulder height or from a ladder. Administrative
  • When felling, keep everyone at least two tree lengths away. Administrative
  • Wear chainsaw chaps, chainsaw boots, gloves, a helmet with face screen and hearing protection. PPE
  • Use quieter tools and methods, such as cut-to-size materials, low-noise machines and battery tools. Substitution
  • Keep noisy equipment away from work areas, and use screens or distance between the noise and people. Engineering (guarding)
  • Loud noise: see step 10 for the full controls Administrative
Medium
4Look for nests, wasps and snakes before climbing or cutting
  • Bites and stings
Medium
  • Check work areas before starting, and get pest control to remove nests. Elimination
  • Look before you reach into dark spaces. Administrative
  • Ask owners to keep pets away from the work area. Administrative
  • Know who has allergies and keep their medication, such as an epinephrine auto-injector, close by. Administrative
  • Wear gloves, long sleeves and boots. Use insect repellent outdoors. PPE
Medium
5Set up the aerial work platform on firm ground outside the drop zone
  • Aerial work platform tip-over or crush
  • Contact with overhead power lines
Critical
  • Check the ground before setting up. Use outriggers and spreader pads, and keep clear of trenches, pits and slopes. Engineering
  • Use a platform with tilt alarm and secondary guarding (anti-entrapment) where there is an overhead crush risk. Engineering
  • Operators are trained to CSA B354.8 and the manufacturer's instructions, and the platform is inspected to CSA B354.7. Administrative
  • Do a pre-start check each day. Keep a trained person on the ground who can lower the platform in an emergency. Administrative
  • Never exceed the safe working load, climb on the rails or use a ladder in the basket. Administrative
  • In boom-type platforms, wear a harness clipped to the basket anchor point. PPE
  • Contact with overhead power lines: see step 1 for the full controls Administrative
Medium
6Cut from the ground or the aerial work platform, never from a ladder
  • Falling from height
  • Chainsaw injuries
Critical
  • Do the work from the ground where you can, for example pre-assemble on the ground or use extension poles. Elimination
  • Install guardrails or edge protection on all open edges before work starts. Engineering (guarding)
  • Use a scaffold, mobile work platform or aerial work platform instead of working off a ladder. Engineering
  • Where edge protection is not practical, use a fall restraint or fall arrest system on a rated anchor point. Engineering
  • Fall protection plan in place where required. Workers trained in fall protection (Working at Heights training in Ontario). Administrative
  • Have a rescue plan so a worker hanging in a harness can be brought down within minutes. Administrative
  • Wear a full body harness with a shock-absorbing lanyard, clipped on at all times when using fall arrest. PPE
  • Chainsaw injuries: see step 3 for the full controls Administrative
Medium
7Drop limbs in sections into the clear drop zone. Before cutting bent or loaded wood, work out which side is under tension and stand clear of where it will spring
  • Falling tools and materials
High
  • Barricade and sign the drop zone under overhead work so nobody walks beneath. Engineering (guarding)
  • Fit toe boards, kick plates and mesh screens on scaffolds and edges. Engineering
  • Use catch fans, debris netting or covered walkways where people pass below. Engineering
  • Tether hand tools when working at height. Engineering
  • Keep platforms tidy. Do not stack materials near edges or above toe board height. Administrative
  • Lower materials with a hoist, chute or rope. Never throw or drop anything down. Administrative
  • Wear a hard hat anywhere objects could fall. PPE
Medium
8Fell the stem with a scarf cut on the felling side and a back cut that leaves a hinge, call a warning, then step back along the planned escape route
  • Falling tools and materials
  • Chainsaw injuries
High
  • Falling tools and materials: see step 7 for the full controls Administrative
  • Chainsaw injuries: see step 3 for the full controls Administrative
Medium
9Refuel with the engine off and the saw cool, on bare ground away from ignition, using an approved fuel can, with an extinguisher at the vehicle
  • Fire and emergencies
High
  • Provide fire extinguishers suited to the site, checked and easy to reach. Engineering
  • Keep exits and escape routes clear and signed. Engineering
  • Have a site emergency plan: alarm, exits, assembly point and emergency contacts. Administrative
  • Keep a stocked first aid kit and at least one trained first aider on site. Administrative
  • Know the site address and how emergency services get in. Call 911. Administrative
  • Go through the emergency plan with every worker and visitor at induction. Administrative
  • Keep flammable materials and rubbish away from exits and escape routes. Administrative
Medium
10Chip or stack wood: feed the chipper butt first from the side, never reach past the feed control bar or kick material in, and stop and isolate it before clearing a jam; then clean up
  • Lifting and carrying heavy loads
  • Hand-arm and whole-body vibration
  • Loud noise
  • Poor housekeeping and waste
High
  • Plan to avoid carrying: have materials delivered, and old items picked up, as close as possible to where they are used. Elimination
  • Use lighter or smaller loads: order smaller bags and shorter lengths, and drain or break down old items before moving them. Substitution
  • Use trolleys, pallet jacks, hoists, vacuum lifters or equipment instead of carrying by hand. Engineering
  • Use a two-person lift for anything heavy, long or awkward. Plan the route first and clear it. Administrative
  • Use low-vibration tools and methods, such as a breaker on an excavator instead of a hand jackhammer. Substitution
  • Keep tools sharp and well maintained, and use anti-vibration handles and seats. Engineering
  • Limit trigger time on high-vibration tools and rotate workers. Administrative
  • Keep hands warm and dry, and take regular breaks. Administrative
  • Use quieter tools and methods, such as cut-to-size materials, low-noise machines and battery tools. Substitution
  • Keep noisy equipment away from work areas, and use screens or distance between the noise and people. Engineering (guarding)
  • Keep tools maintained and use mufflers on compressors and generators. Engineering
  • Limit time on noisy tools and rotate workers. Administrative
  • Order materials to size and send packaging back where you can. Elimination
  • Put waste bins and chutes close to the work. Engineering
  • Clean as you go, and do a full clean up at the end of each day. Administrative
  • Keep exits, stairs and walkways clear at all times. Administrative
Medium

PPE

Chainsaw pants or chapsHard hat (CSA Z94.1)Face shieldHearing protectionWork glovesCSA green triangle safety boots (CSA Z195)High-visibility vest (CSA Z96)Safety glasses (CSA Z94.3)Cut-resistant glovesCoverallsFull body harness (fall arrest)

Plant and equipment

ChainsawBoom lift: Provincial aerial work platform operator training (CSA B354.8)TrailerHand tools

Permits and plans

Fall protection plan

Emergency

Call 911. Add the nearest hospital, the muster point and the first aid attendant for your site.

Sign-off

Supervisor and every worker sign to confirm they have read and understood this FLHA, then sign off at the end of the shift.

Free FLHA template for tree removal

Word (.docx) and PDF, Letter landscape, no email needed. Fill in your site details, then print or send it.

Make yours in 2 minutes

Same document, filled in for your job. Answer a few yes or no questions, the crew signs on the phone, and you send the PDF.

Start this FLHA

Pre-start checklist for tree removal

Tick these off before work starts. They come from the hazards, permits and equipment in this job.

The safe sequence of work

  1. Assess the tree for lean, decay and dead wood, check for power lines and buildings, and plan escape routes; keep 2 tree lengths clear when felling
  2. Set up the drop zone with barriers and traffic or pedestrian control
  3. Check the chainsaw, chain brake and PPE before starting
  4. Look for nests, wasps and snakes before climbing or cutting
  5. Set up the aerial work platform on firm ground outside the drop zone
  6. Cut from the ground or the aerial work platform, never from a ladder
  7. Drop limbs in sections into the clear drop zone. Before cutting bent or loaded wood, work out which side is under tension and stand clear of where it will spring
  8. Fell the stem with a scarf cut on the felling side and a back cut that leaves a hinge, call a warning, then step back along the planned escape route
  9. Refuel with the engine off and the saw cool, on bare ground away from ignition, using an approved fuel can, with an extinguisher at the vehicle
  10. Chip or stack wood: feed the chipper butt first from the side, never reach past the feed control bar or kick material in, and stop and isolate it before clearing a jam; then clean up

Hazards to watch on tree removal

The hazards most specific to this job, and the step where each one comes up.

Step 3, 6, 8Chainsaw injuriesChainsaw kickback or contact with the chain causes deep cuts to the legs, arms and face.
Step 4Bites and stingsSpiders, wasps, ticks and dogs bite or sting workers in attics, crawl spaces and yards.
Step 5Aerial work platform tip-over or crushThe platform tips on soft or sloping ground, the worker is crushed against a beam or ceiling, or is thrown out of the basket.
Step 2Road trafficPassing cars and trucks hit workers or plant working on or next to a road.
Step 9Fire and emergenciesA fire, injury or other emergency happens and workers cannot get out, raise the alarm or get first aid in time.
Step 1, 5Contact with overhead power linesA ladder, aerial work platform, crane, dump truck or long length of material touches or gets close to an overhead line and electrocutes people.
Almost certainLikelyPossibleUnlikelyRareHow bad it could be: First aid only to FatalityBA
Highest risk on tree removal: Critical before controls (B), down to Medium after controls (A), on the Canada 5 by 5 risk matrix (likely and fatality becomes unlikely and serious injury).

What changes on your site

This example covers the job itself. Your site may add more. Add controls for any of these that apply (the builder asks you these as yes or no questions):

  • Will anyone use a ladder or stepladder?
  • Will anyone work on a roof?
  • Is there a fragile roof, skylight or clear roof sheet?
  • Will you use a scaffold or mobile tower?
  • Was the building built before 1990?

Licences and legal requirements in Canada

Equipment on this job that needs a licence, ticket or training:

  • Boom lift: Provincial aerial work platform operator training (CSA B354.8)

Employers must identify hazards before work starts and control them, and workers must be told about them. A field level hazard assessment is done on site, at the start of each shift or task, and reviewed again when conditions change.

Rules that apply: Provincial OHS regulation and CSA B354.7, B354.8; Provincial OHS regulation, fall protection.

Why FLHAs get rejected

Prime contractors and COR auditors send documents back for these reasons. This example avoids them, but check yours too.

  • End of shift boxes already say "None" when the form was signed at the start of the shift.
  • One FLHA reused for days or weeks, or a "review by" date a month away, when the work and conditions change daily.
  • No time of assessment and no record of any revision, which Alberta s.7(3) requires.
  • Workers signed that they "read" it, but nothing shows they took part, which Alberta s.8(1) requires.
  • Work at height with no fall protection plan where the province requires one, or no written rescue procedure for workers using fall arrest.
  • Permits or locates required on site but no permit or ticket numbers recorded.
  • No re-assessment entry after an obvious change such as weather, a new task or a new crew member.

Rules by province for tree removal

Province or territoryKey local ruleRegulator
OntarioFall protection (O. Reg. 213/91 s.26) applies at a fall of more than 3 m, more than 1.2 m where the work area is used as a path for a wheelbarrow or similar equipment, and at any height into operating machinery, water or other liquid, a hazardous substance, or through an opening.Ontario Ministry of Labour, Immigration, Training and Skills Development
British ColumbiaFall protection is required where a fall of 3 m or more may occur (s.11.2). A written fall protection plan is required at 7.5 m or more where there are no permanent guardrails (s.11.3).WorkSafeBC
AlbertaA hazard assessment must be done before work begins, and before a new work site is built (OHS Code s.7(1)). The results must be written down with the controls (s.7(2)).Alberta Occupational Health and Safety
QuebecGuardrails (Safety Code s.2.9.1, as amended by Decret 63-2025) are needed where a worker could fall into liquid or a hazardous substance, onto moving parts or dangerous equipment, 1.2 m or more when using a vehicle, 1.5 m or more when handling a load, and more than 3 m in all other cases.CNESST (Commission des normes, de l'equite, de la sante et de la securite du travail)
ManitobaA prime contractor is required whenever more than one employer or self employed person works on the site at the same time (Act s.7).Manitoba Workplace Safety and Health Branch
SaskatchewanAn occupational health committee is required at 10 or more workers of one employer (Act s.3-22).Saskatchewan Ministry of Labour Relations and Workplace Safety, OHS Division
Nova ScotiaWorkers must be trained in fall protection before using it or working in, supervising or planning work in a fall protection area, with a refresher at least every 3 years (WHSR s.21.19).Nova Scotia Department of Labour, Skills and Immigration, Safety Branch (OHS)
New BrunswickFall protection is needed from 3 m above water or the nearest permanent safe level (Reg 91-191 s.49(1)(a)(i)).WorkSafeNB
Newfoundland and LabradorGive written notice to the minister before starting a construction project that will last 30 days or more, with the site, location, type of work and number of workers (Regs s.8).Government Services, Occupational Health and Safety Division
Prince Edward IslandFall protection is needed from 3 m above the nearest safe surface or water (Fall Protection Regulations s.2(1)(a)).Workers Compensation Board of PEI, OHS Division
YukonEvery employer must do hazard assessments with the committee, representative or workers, and redo them after significant changes or incidents (Regs s.1.03.01).Yukon Workers' Safety and Compensation Board
Northwest TerritoriesFall protection is needed from 3 m, or lower if there is a risk of injury (s.119(1)). Guardrails are needed for falls of 1.2 m to 3 m at permanent work sites (s.119(2)).Workers' Safety and Compensation Commission (WSCC)
NunavutNo 911. To reach the RCMP in an emergency, dial your community's first three digits then 1111 (Iqaluit: 979-1111). Put the local fire, ambulance and RCMP numbers on every FLHA.Workers' Safety and Compensation Commission (WSCC)

Questions

Do I need an FLHA for tree removal?

Provincial OHS law requires hazards to be assessed and controlled before work starts. A field level hazard assessment (FLHA) for tree removal is done on site at the start of the shift and again whenever conditions change.

Who signs the FLHA?

The supervisor and every worker take part in the assessment and sign on before work starts, then sign off at the end of the shift. Review it and re-sign whenever the task or conditions change.

How long do I keep it?

Keep completed hazard assessments for at least 3 years (COR auditors sample the last 12 months). Review this FLHA and re-sign whenever the task, crew or conditions change.

What PPE is needed for tree removal?

Usually Chainsaw pants or chaps, Hard hat (CSA Z94.1), Face shield, Hearing protection, Work gloves, CSA green triangle safety boots (CSA Z195), High-visibility vest (CSA Z96), Safety glasses (CSA Z94.3), Cut-resistant gloves, Coveralls, Full body harness (fall arrest). The site rules may add more, so check with the general contractor.