Method statement for tree felling
You must assess the risks of tree felling and record the significant findings if you employ 5 or more people. On CDM sites the principal contractor will ask for RAMS before you start.
RAMS cover the hazards, who could be harmed and how, the controls and the safe sequence of work, and the crew is briefed and signs. The main hazards are falling from height, road traffic, MEWP tip-over or crush and falling tools and materials.
RAMS example: tree felling
This is a complete RAMS for tree felling, with 10 job steps. Open it in the builder to add your site, crew and signatures, change anything, and download a PDF. Or download the free Word template below and fill it in by hand.
Risk assessment
| # | Activity | Hazards | Who might be harmed | Risk before | Controls | Risk after |
|---|---|---|---|---|---|---|
| 1 | Assess the tree for lean, decay and dead wood, check for power lines and buildings, and plan escape routes; keep 2 tree lengths clear when felling |
| Workers, Plant operators, Public, People below | High (12) |
| Medium (8) |
| 2 | Set up the drop zone with barriers and traffic or pedestrian control |
| Public, Children, Workers, Road users | Very high (15) |
| Medium (5) |
| 3 | Check the chainsaw, chain brake and PPE before starting |
| Workers, People nearby | High (12) |
| Medium (6) |
| 4 | Look for nests, wasps and snakes before climbing or cutting |
| Workers | Medium (9) |
| Medium (6) |
| 5 | Set up the MEWP on firm ground outside the drop zone |
| Workers, People nearby, Plant operators, Public | Very high (15) |
| Medium (5) |
| 6 | Cut from the ground or the MEWP, never from a ladder |
| Workers, People below, People nearby | Very high (20) |
| Medium (5) |
| 7 | Drop limbs in sections into the clear drop zone. Before cutting bent or loaded wood, work out which side is under tension and stand clear of where it will spring |
| Workers, Public, People below | High (12) |
| Medium (8) |
| 8 | Fell the stem with a scarf cut on the felling side and a back cut that leaves a hinge, call a warning, then step back along the planned escape route |
| Workers, Public, People below, People nearby | High (12) |
| Medium (8) |
| 9 | Refuel with the engine off and the saw cool, on bare ground away from ignition, using an approved fuel can, with an extinguisher at the vehicle |
| Workers, Occupants, Visitors | High (10) |
| Medium (5) |
| 10 | Chip or stack wood: feed the chipper butt first from the side, never reach past the feed control bar or kick material in, and stop and isolate it before clearing a jam; then clean up |
| Workers, People nearby, Visitors | High (12) |
| Medium (6) |
Method statement: sequence of work
- Assess the tree for lean, decay and dead wood, check for power lines and buildings, and plan escape routes; keep 2 tree lengths clear when felling
- Set up the drop zone with barriers and traffic or pedestrian control
- Check the chainsaw, chain brake and PPE before starting
- Look for nests, wasps and snakes before climbing or cutting
- Set up the MEWP on firm ground outside the drop zone
- Cut from the ground or the MEWP, never from a ladder
- Drop limbs in sections into the clear drop zone. Before cutting bent or loaded wood, work out which side is under tension and stand clear of where it will spring
- Fell the stem with a scarf cut on the felling side and a back cut that leaves a hinge, call a warning, then step back along the planned escape route
- Refuel with the engine off and the saw cool, on bare ground away from ignition, using an approved fuel can, with an extinguisher at the vehicle
- Chip or stack wood: feed the chipper butt first from the side, never reach past the feed control bar or kick material in, and stop and isolate it before clearing a jam; then clean up
PPE
Plant and equipment
Permits and plans
Emergency
Call 999. Add the nearest A&E, the assembly point and the first aider for your site.
Sign-off
Supervisor and every worker sign to confirm they have read and understood this RAMS.
Free RAMS template for tree felling
Word (.docx) and PDF, A4 landscape, no email needed. Fill in your site details, then print or send it.
Make yours in 2 minutes
Same document, filled in for your job. Answer a few yes or no questions, the crew signs on the phone, and you send the PDF.
Pre-start checklist for tree felling
Tick these off before work starts. They come from the hazards, permits and equipment in this job.
- RAMS read, explained and signed by everyone on the job
- Edge protection or fall protection in place before work at height starts
- MEWP pre-use check done and the operator holds an IPAF card
- Overhead lines identified and safe distances marked
- Exclusion zone and spotter set up for plant and traffic
- Exclusion zone below the work and public kept out
- First aider, first aid kit and emergency number (999) confirmed
- PPE checked and worn: chainsaw trousers, safety helmet, face shield, ear defenders
The safe sequence of work
- Assess the tree for lean, decay and dead wood, check for power lines and buildings, and plan escape routes; keep 2 tree lengths clear when felling
- Set up the drop zone with barriers and traffic or pedestrian control
- Check the chainsaw, chain brake and PPE before starting
- Look for nests, wasps and snakes before climbing or cutting
- Set up the MEWP on firm ground outside the drop zone
- Cut from the ground or the MEWP, never from a ladder
- Drop limbs in sections into the clear drop zone. Before cutting bent or loaded wood, work out which side is under tension and stand clear of where it will spring
- Fell the stem with a scarf cut on the felling side and a back cut that leaves a hinge, call a warning, then step back along the planned escape route
- Refuel with the engine off and the saw cool, on bare ground away from ignition, using an approved fuel can, with an extinguisher at the vehicle
- Chip or stack wood: feed the chipper butt first from the side, never reach past the feed control bar or kick material in, and stop and isolate it before clearing a jam; then clean up
Hazards to watch on tree felling
The hazards most specific to this job, and the step where each one comes up.
What changes on your site
This example covers the job itself. Your site may add more. Add controls for any of these that apply (the builder asks you these as yes or no questions):
- Will anyone use a ladder or stepladder?
- Will anyone work on a roof?
- Is there a fragile roof, skylight or clear roof sheet?
- Will you use a scaffold or mobile tower?
- Was the building built before 2000?
Licences and legal requirements in United Kingdom
Equipment on this job that needs a licence, ticket or training:
- Chainsaw: Lantra or NPTC chainsaw certificate
- Boom MEWP: IPAF PAL card (3b)
Employers must assess the risks of their work and record the significant findings (required where you employ 5 or more people). On CDM projects, contractors give their RAMS to the principal contractor before starting, and brief the workers on it.
Rules that apply: HSE GS6 Avoiding danger from overhead power lines; Work at Height Regulations 2005, regulation 10 (falling objects); CDM Regulations 2015; Safety at Street Works and Road Works Code of Practice (Red Book); Control of Noise at Work Regulations 2005; Work at Height Regulations 2005 and LOLER 1998; Work at Height Regulations 2005; CDM 2015 regs 29 to 31 (fire on construction sites). Occupied premises: Regulatory Reform (Fire Safety) Order 2005 (England and Wales), Fire (Scotland) Act 2005, Fire Safety Regulations (NI) 2010; Manual Handling Operations Regulations 1992; Control of Vibration at Work Regulations 2005.
Why RAMS get rejected
Principal contractors send documents back for these reasons. This example avoids them, but check yours too.
- The method statement is only a list of headings that repeats the risk table and never says how the work is done.
- The method sequence does not match the risk assessment, for example the method strips the roof before the scaffold is handed over.
- Residual risk is still High after controls with no extra measures or explanation.
- It reads as copied: another firm, another address, or wording that does not fit UK sites. HSE warns that copying an example and adding your name does not satisfy the law.
- Work on an older building with no reference to an asbestos survey.
- Plant and access equipment listed with no inspection, thorough examination or competence evidence.
- No briefing record, no revision history, or no named supervisor.
Questions
Do I need RAMS for tree felling?
You must assess the risks of tree felling and record the significant findings if you employ 5 or more people. On CDM sites the principal contractor will ask for RAMS before you start.
Who signs the RAMS?
The person who wrote it and the person who approved it sign and date it. Every worker signs the briefing register after it is explained to them, and the principal contractor reviews and accepts it before you start.
How long do I keep it?
Keep this RAMS, every revision and the signed briefing register with the site file for the length of the job, and keep a copy in your records afterwards.
What PPE is needed for tree felling?
Usually Chainsaw trousers, Safety helmet, Face shield, Ear defenders, Rigger gloves, Safety boots, Hi-vis vest, Safety glasses, Cut-resistant gloves, Coveralls, Full body harness and lanyard. The site rules may add more, so check with the principal contractor.
More landscaping RAMS
Related jobs in other trades
Toolbox talks for this job
Blank RAMS template: free RAMS templates. Also for other countries: Australia (SWMS) · United States (JHA) · Canada (FLHA)