JHA for backflow testing
OSHA expects employers to find and control hazards on every job, and many general contractors require a written JHA for backflow testing before you start.
A JHA breaks the job into steps, lists the hazards in each step and the controls that protect the crew, and the crew signs it. The main hazards are road traffic, falling through a floor opening or void, public entering the work area and bites and stings.
JHA example: backflow testing
This is a complete JHA for backflow testing, with 5 job steps. Open it in the builder to add your site, crew and signatures, change anything, and download a PDF. Or download the free Word template below and fill it in by hand.
Job steps, hazards and controls
| # | Job step | Hazards | Risk before | Controls | Risk after |
|---|---|---|---|---|---|
| 1 | Find the device and set up cones if it is near a driveway or road |
| Critical |
| Medium |
| 2 | Open the pit or cage, checking for spiders, snakes and sharp edges |
| Critical |
| Medium |
| 3 | Tell the site the water will be off, then isolate the device |
| Medium |
| Low |
| 4 | Connect the test kit and run the test |
| Medium |
| Low |
| 5 | Restore supply, tag the device and lodge the report |
| Medium |
| Low |
PPE
Plant and equipment
Permits and plans
Emergency
Call 911. Add the nearest hospital, the assembly point and the first aid / cpr person for your site.
Sign-off
Supervisor and every worker sign to confirm they have read and understood this JHA.
Free JHA template for backflow testing
Word (.docx) and PDF, Letter landscape, no email needed. Fill in your site details, then print or send it.
Make yours in 2 minutes
Same document, filled in for your job. Answer a few yes or no questions, the crew signs on the phone, and you send the PDF.
Pre-start checklist for backflow testing
Tick these off before work starts. They come from the hazards, permits and equipment in this job.
- JHA read, explained and signed by everyone on the job
- Openings, voids and penetrations covered and marked
- Lockout, tagout and test before touch done before work starts
- Exclusion zone and spotter set up for equipment and traffic
- Exclusion zone below the work and public kept out
- First aid / CPR person, first aid kit and emergency number (911) confirmed
- PPE checked and worn: safety-toe boots (ASTM F2413), work gloves, safety glasses (ANSI Z87.1), high-visibility safety apparel, ANSI/ISEA 107 class 2 or 3 (type r near roadways)
The safe sequence of work
- Find the device and set up cones if it is near a driveway or road
- Open the pit or cage, checking for spiders, snakes and sharp edges
- Tell the site the water will be off, then isolate the device
- Connect the test kit and run the test
- Restore supply, tag the device and lodge the report
Hazards to watch on backflow testing
The hazards most specific to this job, and the step where each one comes up.
What changes on your site
This example covers the job itself. Your site may add more. Add controls for any of these that apply (the builder asks you these as yes or no questions):
- Will anyone work 6 feet or more above a lower level?
- Will anyone use a ladder or stepladder?
- Will anyone work on a roof?
- Is there a skylight, fiberglass panel or other fragile roofing?
- Will you use a scaffold or rolling tower?
Why JHAs get rejected
General contractors send documents back for these reasons. This example avoids them, but check yours too.
- Generic steps such as "work safely" or "use PPE" with no task-specific hazards or controls.
- No OSHA standards referenced for the hazards that have them, such as fall protection, ladders, scaffolds or silica.
- No competent person named for fall protection, excavation, scaffolds or silica where those hazards exist.
- Equipment listed without inspection requirements, and no training listed for the people using it.
- Respirators listed with no respiratory protection program, medical clearance or fit test.
- Controls rely only on PPE when engineering controls such as guardrails, wet cutting or extraction are feasible.
- No crew sign-off, or no date and revision when the job has changed.
Questions
Do I need a JHA for backflow testing?
OSHA expects employers to find and control hazards on every job, and many general contractors require a written JHA for backflow testing before you start.
Who signs the JHA?
The supervisor or competent person who prepared it signs, and every crew member signs to show they were trained on the hazards and controls before the job starts. Many general contractors also sign to accept it.
How long do I keep it?
Keep this JHA on site during the job, and keep it with the training and inspection records for at least 1 year after the job (longer if your state plan or general contractor requires it). OSHA does not set a retention period for JHAs themselves.
What PPE is needed for backflow testing?
Usually Safety-toe boots (ASTM F2413), Work gloves, Safety glasses (ANSI Z87.1), High-visibility safety apparel, ANSI/ISEA 107 Class 2 or 3 (Type R near roadways), Coveralls, Cut-resistant gloves, N95 respirator, Face shield (ANSI Z87.1), Hearing protection (earmuffs or plugs). The site rules may add more, so check with the general contractor.