JHA for electrical fault finding
OSHA expects employers to find and control hazards on every job, and many general contractors require a written JHA for electrical fault finding before you start.
A JHA breaks the job into steps, lists the hazards in each step and the controls that protect the crew, and the crew signs it. The main hazards are electric shock from live wiring, electric shock from cords and power tools, falling from a ladder and working in an occupied home or building.
JHA example: electrical fault finding
This is a complete JHA for electrical fault finding, with 6 job steps. Open it in the builder to add your site, crew and signatures, change anything, and download a PDF. Or download the free Word template below and fill it in by hand.
Job steps, hazards and controls
| # | Job step | Hazards | Risk before | Controls | Risk after |
|---|---|---|---|---|---|
| 1 | Talk to the client about the fault and keep people away from the electrical panel |
| Medium |
| Low |
| 2 | Check the test meter on a known source before and after use |
| Critical |
| Medium |
| 3 | Do live testing only when it cannot be done dead, using insulated tools, mats and arc rated gear |
| Critical |
| Medium |
| 4 | Isolate the faulty circuit, apply lockout/tagout and prove dead before any repair |
| Critical |
| Medium |
| 5 | Repair or replace the faulty part |
| High |
| Medium |
| 6 | Retest, restore power and record what was found |
| Critical |
| Medium |
PPE
Plant and equipment
Permits and plans
Emergency
Call 911. Add the nearest hospital, the assembly point and the first aid / cpr person for your site.
Sign-off
Supervisor and every worker sign to confirm they have read and understood this JHA.
Free JHA template for electrical fault finding
Word (.docx) and PDF, Letter landscape, no email needed. Fill in your site details, then print or send it.
Make yours in 2 minutes
Same document, filled in for your job. Answer a few yes or no questions, the crew signs on the phone, and you send the PDF.
Pre-start checklist for electrical fault finding
Tick these off before work starts. They come from the hazards, permits and equipment in this job.
- JHA read, explained and signed by everyone on the job
- Ladder inspected, secured and extending 3 ft above the landing
- Lockout, tagout and test before touch done before work starts
- First aid / CPR person, first aid kit and emergency number (911) confirmed
- PPE checked and worn: safety-toe boots (ASTM F2413), safety glasses (ANSI Z87.1), rubber insulating gloves, arc flash PPE (NFPA 70E)
The safe sequence of work
- Talk to the client about the fault and keep people away from the electrical panel
- Check the test meter on a known source before and after use
- Do live testing only when it cannot be done dead, using insulated tools, mats and arc rated gear
- Isolate the faulty circuit, apply lockout/tagout and prove dead before any repair
- Repair or replace the faulty part
- Retest, restore power and record what was found
Hazards to watch on electrical fault finding
The hazards most specific to this job, and the step where each one comes up.
What changes on your site
This example covers the job itself. Your site may add more. Add controls for any of these that apply (the builder asks you these as yes or no questions):
- Will anyone work 6 feet or more above a lower level?
- Will anyone work on a roof?
- Is there a skylight, fiberglass panel or other fragile roofing?
- Will you use a scaffold or rolling tower?
- Will you use an aerial lift (scissor lift or boom lift)?
Why JHAs get rejected
General contractors send documents back for these reasons. This example avoids them, but check yours too.
- Generic steps such as "work safely" or "use PPE" with no task-specific hazards or controls.
- No OSHA standards referenced for the hazards that have them, such as fall protection, ladders, scaffolds or silica.
- No competent person named for fall protection, excavation, scaffolds or silica where those hazards exist.
- Equipment listed without inspection requirements, and no training listed for the people using it.
- Respirators listed with no respiratory protection program, medical clearance or fit test.
- Controls rely only on PPE when engineering controls such as guardrails, wet cutting or extraction are feasible.
- No crew sign-off, or no date and revision when the job has changed.
Questions
Do I need a JHA for electrical fault finding?
OSHA expects employers to find and control hazards on every job, and many general contractors require a written JHA for electrical fault finding before you start.
Who signs the JHA?
The supervisor or competent person who prepared it signs, and every crew member signs to show they were trained on the hazards and controls before the job starts. Many general contractors also sign to accept it.
How long do I keep it?
Keep this JHA on site during the job, and keep it with the training and inspection records for at least 1 year after the job (longer if your state plan or general contractor requires it). OSHA does not set a retention period for JHAs themselves.
What PPE is needed for electrical fault finding?
Usually Safety-toe boots (ASTM F2413), Safety glasses (ANSI Z87.1), Rubber insulating gloves, Arc flash PPE (NFPA 70E), N95 respirator, Work gloves, Cut-resistant gloves, Hard hat (ANSI Z89.1). The site rules may add more, so check with the general contractor.
More electrical JHAs
Related jobs in other trades
Toolbox talks for this job
Blank JHA template: free JHA templates. Also for other countries: Australia (SWMS) · United Kingdom (RAMS) · Canada (FLHA)