JHA for residential rewiring
OSHA expects employers to find and control hazards on every job, and many general contractors require a written JHA for residential rewiring before you start.
A JHA breaks the job into steps, lists the hazards in each step and the controls that protect the crew, and the crew signs it. The main hazards are silica dust from concrete, brick, stone and tiles, disturbing asbestos, electric shock from live wiring and falling through a floor opening or void.
JHA example: residential rewiring
This is a complete JHA for residential rewiring, with 9 job steps. Open it in the builder to add your site, crew and signatures, change anything, and download a PDF. Or download the free Word template below and fill it in by hand.
Job steps, hazards and controls
| # | Job step | Hazards | Risk before | Controls | Risk after |
|---|---|---|---|---|---|
| 1 | Agree a room by room plan with the occupants and protect floors and furniture |
| Medium |
| Low |
| 2 | Check the asbestos survey and look for old lead paint before cutting into walls and ceilings |
| Critical |
| Medium |
| 3 | Isolate the circuits being worked on, apply lockout/tagout and test to prove dead; run any temporary supply through GFCI protection |
| Critical |
| Medium |
| 4 | Work in the ceiling space only on joists, with lighting and short breaks in hot weather |
| Critical |
| Medium |
| 5 | Scan for pipes, then chase walls and drill holes using dust extraction |
| Critical |
| Medium |
| 6 | Strip out old wiring, treating every cable as live until it is proven dead |
| Critical |
| Medium |
| 7 | Pull in new cables, keeping walkways and stairs clear |
| High |
| Medium |
| 8 | Fit off outlets, switches and lights from a stable step or platform |
| High |
| Medium |
| 9 | Test every circuit, re-energise, make good and hand over the certificate |
| Critical |
| Medium |
PPE
Plant and equipment
Permits and plans
Emergency
Call 911. Add the nearest hospital, the assembly point and the first aid / cpr person for your site.
Sign-off
Supervisor and every worker sign to confirm they have read and understood this JHA.
Free JHA template for residential rewiring
Word (.docx) and PDF, Letter landscape, no email needed. Fill in your site details, then print or send it.
Make yours in 2 minutes
Same document, filled in for your job. Answer a few yes or no questions, the crew signs on the phone, and you send the PDF.
Pre-start checklist for residential rewiring
Tick these off before work starts. They come from the hazards, permits and equipment in this job.
- JHA read, explained and signed by everyone on the job
- Openings, voids and penetrations covered and marked
- Ladder inspected, secured and extending 3 ft above the landing
- Lockout, tagout and test before touch done before work starts
- Asbestos register or survey checked for the work area
- Water suppression or on-tool extraction fitted; respirators fit tested
- Weather checked: water, shade and rest breaks planned
- First aid / CPR person, first aid kit and emergency number (911) confirmed
- PPE checked and worn: safety-toe boots (ASTM F2413), safety glasses (ANSI Z87.1), N95 respirator, work gloves
The safe sequence of work
- Agree a room by room plan with the occupants and protect floors and furniture
- Check the asbestos survey and look for old lead paint before cutting into walls and ceilings
- Isolate the circuits being worked on, apply lockout/tagout and test to prove dead; run any temporary supply through GFCI protection
- Work in the ceiling space only on joists, with lighting and short breaks in hot weather
- Scan for pipes, then chase walls and drill holes using dust extraction
- Strip out old wiring, treating every cable as live until it is proven dead
- Pull in new cables, keeping walkways and stairs clear
- Fit off outlets, switches and lights from a stable step or platform
- Test every circuit, re-energise, make good and hand over the certificate
Hazards to watch on residential rewiring
The hazards most specific to this job, and the step where each one comes up.
What changes on your site
This example covers the job itself. Your site may add more. Add controls for any of these that apply (the builder asks you these as yes or no questions):
- Will anyone work 6 feet or more above a lower level?
- Will anyone work on a roof?
- Is there a skylight, fiberglass panel or other fragile roofing?
- Will you use a scaffold or rolling tower?
- Will you use an aerial lift (scissor lift or boom lift)?
Why JHAs get rejected
General contractors send documents back for these reasons. This example avoids them, but check yours too.
- Generic steps such as "work safely" or "use PPE" with no task-specific hazards or controls.
- No OSHA standards referenced for the hazards that have them, such as fall protection, ladders, scaffolds or silica.
- No competent person named for fall protection, excavation, scaffolds or silica where those hazards exist.
- Equipment listed without inspection requirements, and no training listed for the people using it.
- Respirators listed with no respiratory protection program, medical clearance or fit test.
- Controls rely only on PPE when engineering controls such as guardrails, wet cutting or extraction are feasible.
- No crew sign-off, or no date and revision when the job has changed.
Questions
Do I need a JHA for residential rewiring?
OSHA expects employers to find and control hazards on every job, and many general contractors require a written JHA for residential rewiring before you start.
Who signs the JHA?
The supervisor or competent person who prepared it signs, and every crew member signs to show they were trained on the hazards and controls before the job starts. Many general contractors also sign to accept it.
How long do I keep it?
Keep this JHA on site during the job, and keep it with the training and inspection records for at least 1 year after the job (longer if your state plan or general contractor requires it). OSHA does not set a retention period for JHAs themselves.
What PPE is needed for residential rewiring?
Usually Safety-toe boots (ASTM F2413), Safety glasses (ANSI Z87.1), N95 respirator, Work gloves, Knee pads, Half-face respirator (P100 cartridges), Coveralls, Rubber insulating gloves, Arc flash PPE (NFPA 70E), Sun protection (sunscreen, hat, long sleeves), High-visibility safety apparel, ANSI/ISEA 107 Class 2 or 3 (Type R near roadways), Hearing protection (earmuffs or plugs), Cut-resistant gloves, Hard hat (ANSI Z89.1). The site rules may add more, so check with the general contractor.