Method statement for lead paint removal
You must assess the risks of lead paint removal and record the significant findings if you employ 5 or more people. On CDM sites the principal contractor will ask for RAMS before you start.
RAMS cover the hazards, who could be harmed and how, the controls and the safe sequence of work, and the crew is briefed and signs. The main hazards are fire from hot works, lead paint dust and fumes, public entering the work area and flammable liquids and gases.
RAMS example: lead paint removal
This is a complete RAMS for lead paint removal, with 10 job steps. Open it in the builder to add your site, crew and signatures, change anything, and download a PDF. Or download the free Word template below and fill it in by hand.
Risk assessment
| # | Activity | Hazards | Who might be harmed | Risk before | Controls | Risk after |
|---|---|---|---|---|---|---|
| 1 | Test the paint, tell the occupants, and keep children and pregnant people away |
| Workers, Residents, Children, Staff | High (12) |
| Low (4) |
| 2 | Turn off heating and cooling and close windows and vents in the work area |
| Workers, Residents, Children, Occupants | High (12) |
| Low (4) |
| 3 | Seal the area with plastic and warning signs |
| Workers, Residents, Children, Public | High (12) |
| Low (4) |
| 4 | Put on coveralls and a fitted respirator, and set up a wash point |
| Workers, Residents, Children, Occupants | High (12) |
| Medium (6) |
| 5 | Mist and wet scrape the paint; no dry sanding or open flame |
| Workers, Residents, Children, Occupants | High (12) |
| Medium (6) |
| 6 | Use chemical strippers with ventilation and chemical gloves |
| Workers, Occupants, Public | High (10) |
| Medium (6) |
| 7 | Use a heat gun only on low settings, below the temperature that makes lead fumes |
| Workers, Occupants, Public, Residents, Children | Very high (15) |
| Medium (5) |
| 8 | Clean with an H-class vacuum and wet wipes, never dry sweep |
| Workers, Residents, Children, Visitors | High (12) |
| Low (4) |
| 9 | Bag waste, remove coveralls in the work area and wash before eating |
| Workers, Residents, Children | High (12) |
| Low (4) |
| 10 | Check the area is clean before removing plastic and letting occupants back in |
| Workers, Residents, Children, Staff | High (12) |
| Low (4) |
Method statement: sequence of work
- Test the paint, tell the occupants, and keep children and pregnant people away
- Turn off heating and cooling and close windows and vents in the work area
- Seal the area with plastic and warning signs
- Put on coveralls and a fitted respirator, and set up a wash point
- Mist and wet scrape the paint; no dry sanding or open flame
- Use chemical strippers with ventilation and chemical gloves
- Use a heat gun only on low settings, below the temperature that makes lead fumes
- Clean with an H-class vacuum and wet wipes, never dry sweep
- Bag waste, remove coveralls in the work area and wash before eating
- Check the area is clean before removing plastic and letting occupants back in
PPE
Plant and equipment
Permits and plans
Emergency
Call 999. Add the nearest A&E, the assembly point and the first aider for your site.
Sign-off
Supervisor and every worker sign to confirm they have read and understood this RAMS.
Free RAMS template for lead paint removal
Word (.docx) and PDF, A4 landscape, no email needed. Fill in your site details, then print or send it.
Make yours in 2 minutes
Same document, filled in for your job. Answer a few yes or no questions, the crew signs on the phone, and you send the PDF.
Pre-start checklist for lead paint removal
Tick these off before work starts. They come from the hazards, permits and equipment in this job.
- RAMS read, explained and signed by everyone on the job
- Hot work permit issued, extinguisher at hand, fire watch arranged
- Exclusion zone below the work and public kept out
- First aider, first aid kit and emergency number (999) confirmed
- PPE checked and worn: safety glasses, half-mask respirator (P3 filters), coveralls, chemical-resistant gloves
The safe sequence of work
- Test the paint, tell the occupants, and keep children and pregnant people away
- Turn off heating and cooling and close windows and vents in the work area
- Seal the area with plastic and warning signs
- Put on coveralls and a fitted respirator, and set up a wash point
- Mist and wet scrape the paint; no dry sanding or open flame
- Use chemical strippers with ventilation and chemical gloves
- Use a heat gun only on low settings, below the temperature that makes lead fumes
- Clean with an H-class vacuum and wet wipes, never dry sweep
- Bag waste, remove coveralls in the work area and wash before eating
- Check the area is clean before removing plastic and letting occupants back in
Hazards to watch on lead paint removal
The hazards most specific to this job, and the step where each one comes up.
What changes on your site
This example covers the job itself. Your site may add more. Add controls for any of these that apply (the builder asks you these as yes or no questions):
- Will anyone work at height, anywhere a fall could hurt them?
- Will anyone use a ladder or stepladder?
- Will anyone work on a roof?
- Is there a fragile roof, skylight or clear roof sheet?
- Will you use a scaffold or mobile tower?
Why RAMS get rejected
Principal contractors send documents back for these reasons. This example avoids them, but check yours too.
- The method statement is only a list of headings that repeats the risk table and never says how the work is done.
- The method sequence does not match the risk assessment, for example the method strips the roof before the scaffold is handed over.
- Residual risk is still High after controls with no extra measures or explanation.
- It reads as copied: another firm, another address, or wording that does not fit UK sites. HSE warns that copying an example and adding your name does not satisfy the law.
- Work on an older building with no reference to an asbestos survey.
- Plant and access equipment listed with no inspection, thorough examination or competence evidence.
- No briefing record, no revision history, or no named supervisor.
Questions
Do I need RAMS for lead paint removal?
You must assess the risks of lead paint removal and record the significant findings if you employ 5 or more people. On CDM sites the principal contractor will ask for RAMS before you start.
Who signs the RAMS?
The person who wrote it and the person who approved it sign and date it. Every worker signs the briefing register after it is explained to them, and the principal contractor reviews and accepts it before you start.
How long do I keep it?
Keep this RAMS, every revision and the signed briefing register with the site file for the length of the job, and keep a copy in your records afterwards.
What PPE is needed for lead paint removal?
Usually Safety glasses, Half-mask respirator (P3 filters), Coveralls, Chemical-resistant gloves, Safety boots, Rigger gloves, FFP3 dust mask, Hi-vis vest, Safety goggles, Welding gauntlets, Face shield. The site rules may add more, so check with the principal contractor.