Method statement for external painting
You must assess the risks of external painting and record the significant findings if you employ 5 or more people. On CDM sites the principal contractor will ask for RAMS before you start.
RAMS cover the hazards, who could be harmed and how, the controls and the safe sequence of work, and the crew is briefed and signs. The main hazards are falling from height, MEWP tip-over or crush, scaffold collapse or fall from scaffold and disturbing asbestos.
RAMS example: external painting
This is a complete RAMS for external painting, with 6 job steps. Open it in the builder to add your site, crew and signatures, change anything, and download a PDF. Or download the free Word template below and fill it in by hand.
Risk assessment
| # | Activity | Hazards | Who might be harmed | Risk before | Controls | Risk after |
|---|---|---|---|---|---|---|
| 1 | Check for power lines and set up barricades under the work |
| Workers, Plant operators, Public, Children, People below | High (12) |
| Medium (8) |
| 2 | Set up scaffold, MEWP or secured ladders on firm ground |
| Workers, People below, People nearby, Public | Very high (20) |
| Medium (8) |
| 3 | Test for lead paint and asbestos sheeting before any prep |
| Workers, Residents, Children, Occupants, Public | Very high (15) |
| Medium (5) |
| 4 | Wash down and scrape, keeping water away from power |
| Workers, People nearby, Visitors, Public | High (12) |
| Low (4) |
| 5 | Paint or spray, watching wind drift |
| Workers, Occupants, Public | High (12) |
| Medium (8) |
| 6 | Clean up, dispose of waste paint properly and remove access |
| Workers, Visitors | Medium (8) |
| Low (4) |
Method statement: sequence of work
- Check for power lines and set up barricades under the work
- Set up scaffold, MEWP or secured ladders on firm ground
- Test for lead paint and asbestos sheeting before any prep
- Wash down and scrape, keeping water away from power
- Paint or spray, watching wind drift
- Clean up, dispose of waste paint properly and remove access
PPE
Plant and equipment
Permits and plans
Emergency
Call 999. Add the nearest A&E, the assembly point and the first aider for your site.
Sign-off
Supervisor and every worker sign to confirm they have read and understood this RAMS.
Free RAMS template for external painting
Word (.docx) and PDF, A4 landscape, no email needed. Fill in your site details, then print or send it.
Make yours in 2 minutes
Same document, filled in for your job. Answer a few yes or no questions, the crew signs on the phone, and you send the PDF.
Pre-start checklist for external painting
Tick these off before work starts. They come from the hazards, permits and equipment in this job.
- RAMS read, explained and signed by everyone on the job
- Edge protection or fall protection in place before work at height starts
- Ladder inspected, secured and extending 1 m above the landing
- Scaffold inspected in the last 7 days, tag in date
- MEWP pre-use check done and the operator holds an IPAF card
- Overhead lines identified and safe distances marked
- Asbestos register or survey checked for the work area
- Exclusion zone below the work and public kept out
- Weather checked: water, shade and rest breaks planned
- Wind and weather checked; stop work limits agreed
- First aider, first aid kit and emergency number (999) confirmed
- PPE checked and worn: safety boots, safety glasses, FFP3 dust mask, chemical-resistant gloves
The safe sequence of work
- Check for power lines and set up barricades under the work
- Set up scaffold, MEWP or secured ladders on firm ground
- Test for lead paint and asbestos sheeting before any prep
- Wash down and scrape, keeping water away from power
- Paint or spray, watching wind drift
- Clean up, dispose of waste paint properly and remove access
Hazards to watch on external painting
The hazards most specific to this job, and the step where each one comes up.
What changes on your site
This example covers the job itself. Your site may add more. Add controls for any of these that apply (the builder asks you these as yes or no questions):
- Will anyone work on a roof?
- Is there a fragile roof, skylight or clear roof sheet?
- Will you cut, grind or drill concrete, brick, stone, tiles or fibre cement?
- Will you use chemicals, solvents, glues, paints or fuels?
- Will people be living or working in the building while you work?
Licences and legal requirements in United Kingdom
Equipment on this job that needs a licence, ticket or training:
- Mobile access tower: PASMA certificate
- Boom MEWP: IPAF PAL card (3b)
Employers must assess the risks of their work and record the significant findings (required where you employ 5 or more people). On CDM projects, contractors give their RAMS to the principal contractor before starting, and brief the workers on it.
Rules that apply: HSE GS6 Avoiding danger from overhead power lines; CDM Regulations 2015; Work at Height Regulations 2005, regulation 10 (falling objects); Work at Height Regulations 2005; Work at Height Regulations 2005 and LOLER 1998; Control of Lead at Work Regulations 2002; Control of Asbestos Regulations 2012; Electricity at Work Regulations 1989; COSHH Regulations 2002.
Why RAMS get rejected
Principal contractors send documents back for these reasons. This example avoids them, but check yours too.
- The method statement is only a list of headings that repeats the risk table and never says how the work is done.
- The method sequence does not match the risk assessment, for example the method strips the roof before the scaffold is handed over.
- Residual risk is still High after controls with no extra measures or explanation.
- It reads as copied: another firm, another address, or wording that does not fit UK sites. HSE warns that copying an example and adding your name does not satisfy the law.
- Work on an older building with no reference to an asbestos survey.
- Plant and access equipment listed with no inspection, thorough examination or competence evidence.
- No briefing record, no revision history, or no named supervisor.
Questions
Do I need RAMS for external painting?
You must assess the risks of external painting and record the significant findings if you employ 5 or more people. On CDM sites the principal contractor will ask for RAMS before you start.
Who signs the RAMS?
The person who wrote it and the person who approved it sign and date it. Every worker signs the briefing register after it is explained to them, and the principal contractor reviews and accepts it before you start.
How long do I keep it?
Keep this RAMS, every revision and the signed briefing register with the site file for the length of the job, and keep a copy in your records afterwards.
What PPE is needed for external painting?
Usually Safety boots, Safety glasses, FFP3 dust mask, Chemical-resistant gloves, Sun protection (sunscreen and neck cover), Full body harness and lanyard, Hi-vis vest, Safety helmet, Half-mask respirator (P3 filters), Coveralls, Rigger gloves, Face shield, Ear defenders, Safety goggles. The site rules may add more, so check with the principal contractor.