SWMS for wet area waterproofing
A SWMS is required by law if wet area waterproofing includes any high risk construction work, such as working where someone could fall more than 2 metres. Many principal contractors ask for one either way.
It must list the hazards, the controls and how they will be put in place, monitored and reviewed, and the workers must be consulted and sign before starting. The main hazards are silica dust from concrete, brick, stone and tiles, electric shock from leads and power tools, loud noise and flammable liquids and gases.
SWMS example: wet area waterproofing
This is a complete SWMS for wet area waterproofing, with 9 job steps. Open it in the builder to add your site, crew and signatures, change anything, and download a PDF. Or download the free Word template below and fill it in by hand.
High risk construction work covered
Job steps, hazards and controls
| # | Job step | Hazards | Risk before | Controls | Risk after |
|---|---|---|---|---|---|
| 1 | Check the substrate is sheeted, clean, dry and cured, and keep occupants out of the room |
| Medium |
| Low |
| 2 | Read the safety data sheets and set up fans or open windows, as solvent membranes give off fumes |
| Medium |
| Medium |
| 3 | Have a licensed electrician isolate or make safe power points and lights in the room if they will get wet, and run tools through RCD protection |
| High |
| Low |
| 4 | Prepare the surface, grinding with extraction |
| Extreme |
| Medium |
| 5 | Fit bond breakers, puddle flanges and angles |
| Medium |
| Medium |
| 6 | Prime the surface, keeping all ignition sources away until it is dry |
| High |
| Medium |
| 7 | Apply the membrane in coats with nitrile gloves and the respirator the SDS lists (an organic vapour cartridge for solvent or polyurethane products), kneeling on pads |
| Medium |
| Medium |
| 8 | Let it cure, then flood test |
| Medium |
| Low |
| 9 | Clean tools and dispose of waste membrane and tins properly |
| Medium |
| Medium |
PPE
Plant and equipment
Emergency
Call 000. Add the nearest hospital, the assembly point and the first aider for your site.
Sign-off
Supervisor and every worker sign to confirm they have read and understood this SWMS.
Make yours in 2 minutes
Same document, filled in for your job. Answer a few yes or no questions, the crew signs on the phone, and you send the PDF.
Pre-start checklist for wet area waterproofing
Tick these off before work starts. They come from the hazards, permits and equipment in this job.
- SWMS read, explained and signed by everyone on the job
- Water suppression or on-tool extraction fitted; respirators fit tested
- First aider, first aid kit and emergency number (000) confirmed
- PPE checked and worn: chemical-resistant gloves (nitrile), safety glasses, half-face respirator (P2 or P3 filters), knee pads
The safe sequence of work
- Check the substrate is sheeted, clean, dry and cured, and keep occupants out of the room
- Read the safety data sheets and set up fans or open windows, as solvent membranes give off fumes
- Have a licensed electrician isolate or make safe power points and lights in the room if they will get wet, and run tools through RCD protection
- Prepare the surface, grinding with extraction
- Fit bond breakers, puddle flanges and angles
- Prime the surface, keeping all ignition sources away until it is dry
- Apply the membrane in coats with nitrile gloves and the respirator the SDS lists (an organic vapour cartridge for solvent or polyurethane products), kneeling on pads
- Let it cure, then flood test
- Clean tools and dispose of waste membrane and tins properly
Hazards to watch on wet area waterproofing
The hazards most specific to this job, and the step where each one comes up.
What changes on your site
This example covers the job itself. Your site may add more. Add controls for any of these that apply (the builder asks you these as yes or no questions):
- Will anyone work more than 2 metres off the ground?
- Will anyone use a ladder or stepladder?
- Will anyone work on a roof?
- Is there a skylight, clear sheet, fibro or other fragile roofing?
- Will you use a scaffold or mobile tower?
Why SWMS get rejected
Principal contractors send documents back for these reasons. This example avoids them, but check yours too.
- It is generic: another site address, tasks that are not on this job, or no sign it was reviewed for this site. WorkSafe WA says a generic SWMS may not meet the regulations unless it is reviewed and amended for the workplace.
- The HRCW boxes are not ticked, or the ticks do not match the tasks (for example a roof job with no falls box ticked).
- Falls are controlled only by "be careful", training or a harness, with no edge protection or scaffold and no reason why higher controls are not reasonably practicable.
- Workers will clip on to a harness but there is no rescue plan for someone left hanging.
- The "how controls are implemented, monitored and reviewed" part is missing, or it says the same thing on every row.
- No worker sign-on, no person responsible for compliance, or a date given to the principal contractor that is before they actually received it.
- Licence or White Card details are missing for workers operating plant or doing licensed high risk work.
Questions
Do I need a SWMS for wet area waterproofing?
A SWMS is required by law if wet area waterproofing includes any high risk construction work, such as working where someone could fall more than 2 metres. Many principal contractors ask for one either way.
Who signs the SWMS?
The person conducting the business (PCBU) or their supervisor prepares it with the workers, and every worker doing the high risk work signs to show they were consulted and understand it. Give a copy to the principal contractor before work starts.
How long do I keep it?
Keep this SWMS, and every revised version, until the high risk construction work is finished, where workers and inspectors can see it on site. If a notifiable incident happens during the work, keep it for at least 2 years after the incident.
What PPE is needed for wet area waterproofing?
Usually Chemical-resistant gloves (nitrile), Safety glasses, Half-face respirator (P2 or P3 filters), Knee pads, P2 dust mask, Steel cap boots, Safety goggles, Overalls, Work gloves, Hearing protection (earmuffs or plugs), Cut-resistant gloves. The site rules may add more, so check with the principal contractor.
More tiling SWMS
Related jobs in other trades
Toolbox talks for this job
Blank SWMS template: free SWMS templates. Also for other countries: United Kingdom (RAMS) · United States (JHA) · Canada (FLHA)
